Control Group, Yale’s experimental theater crew, erected what
they call The CGeodesic Yurt on Old Campus. The nearly dodecahedral structure was made from PVC pipes and masking tape. Sarah Delappe ’12 said the ensemble will probably perform in it eventually. In the meantime members of the ensemble squatted down and danced in circles as a man on stilts played a waltz on a melodica with an air tube.
Correction: March 27, 2011
An earlier version of this post reported that a group member was playing an accordion. In fact, he was playing a melodica with an air tube.
Pingback: Google
Pingback: nottingham escorts
Pingback: Dubai escorts
Pingback: escort paris
Pingback: tabletki na odchudzanie
Pingback: http://www.willevansclothing.com
Pingback: pdf to txt
Pingback: Nuru Massage London
Pingback: nodents.com
Pingback: take my online class
Pingback: http://paintlessdentrepair-usa.com-paintless dent repair
Pingback: pdrti.com - paintless dent repair
Pingback: Paintless dent repair
Pingback: paintless dent repair training
Pingback: sentricon
Pingback: Sydney escorts
Pingback: Buy Facebook Likes Cheap
Pingback: can you improve your eyesight naturally
Pingback: doğum fotoğrafçısı
Pingback: http://paintlessdentrepaircalifornia.com
Pingback: banners madison
Pingback: health and wellness speaker
Pingback: Lloyd Irvin Rape
Pingback: file and data recovery
Pingback: seo link building
Pingback: http://rivenlol.wordpress.com/
Pingback: max credit
Pingback: line of credit
Pingback: düğün fotoğrafçısı fiyatları
Pingback: google sniper review